Expressway Safety Project

Executed crash barrier work for expressway with proper spacing and fixing. Focused on safety compliance and efficient installation.

project details

Client: Jack Travol
Project Start: 24/04/2020
Product Required: 5900 Product
Investors Website: Topgear88.com
Client Location: Slovenija, Ljubljana
Value: 587.000$
Other: Your Custom

Brochure

Download our document to see specific data of the service and how we work.

BROCHURE.DOC
1.25M
BROCHURE.PDF
3.81M

Let’s Start Work
Together

Please feel free to contact us. We will get back to you with 1-2 business days. Or just call us now.

About Project

The Bridge Guardrail Installation project was completed to improve vehicle safety and impact protection across bridge sections and elevated highway structures. Our team carried out accurate post fixing, guardrail alignment, and W-beam installation using advanced hydraulic post hammer machinery and experienced installation engineers.

The complete installation process followed highway and bridge safety standards with proper spacing, strong structural support, and precise barrier alignment. Every stage of the project was carefully inspected to ensure durability, stability, corrosion resistance, and long-term bridge safety performance.

Our Client’s Challenge

The project required precise guardrail installation on bridge edges and elevated structures while maintaining traffic safety and uninterrupted vehicle movement. Limited working space, strict alignment requirements, and structural safety standards made execution highly challenging.

Our team managed the entire installation process with systematic planning, accurate level checking, and efficient hydraulic post hammer operations to ensure smooth and timely project completion without compromising safety or quality.

Our Approach And Solution

We used hydraulic post hammer machines for accurate post driving and maintained continuous alignment checks throughout the bridge installation process. Proper spacing measurements and level inspections ensured every guardrail post remained perfectly aligned for strong structural support.

After post installation, W-beam guardrails and spacers were fixed with precision bolt tightening and safety verification. Final inspection and testing were conducted to confirm impact resistance, stability, and reliable long-term bridge protection performance.

Project Execution Process

The Bridge Guardrail Installation project was executed through a planned and safety-oriented workflow to ensure accurate barrier positioning and long-term structural reliability. Our team first completed alignment marking, spacing measurement, and level verification before starting hydraulic post hammer operations for direct post installation along the bridge section.

After successful post fixing, W-beam guardrails and spacers were installed with precise bolt tightening and structural alignment checks. Continuous inspection and quality monitoring were carried out throughout the execution process to maintain impact resistance, durability, and highway safety standards before final project handover.